How much attic space is needed to install a Solatube Ventilation Add-On Kit?

A minimum of 12 1/2 in. (318 mm) between ceiling joists and a minimum of 12 in. (304 mm) of vertical clearance above the ceiling is required in order to use the Ventilation Add-On Kit. It is also important to note that service access is required to the fan motor assembly junction box.

Testimonials

Contact Us

Schedule a free consultation with one of our highly-trained, certified daylighting experts.

Service Locations

Ocala/The Villages

Showroom Location
120 SE Hwy. 484
Ocala, FL 34480

M - F / 8:00AM – 4:30PM
Call: 352-205-4204

Orlando/Daytona

Orange, Volusia, Flagler,
Seminole & Osceola Counties

M - F / 8:00AM – 4:30PM
Call: 866-662-6254

Pasco/Hernando

Pasco & Hernando Counties

M - F / 8:00AM – 4:30PM
Call: 866-662-4214

Jacksonville

St. Johns, Putnam, Clay,
Bradford, Union, Columbia,
Baker, Duval & Nassau Counties

M - F / 8:00AM – 4:30PM
Call: 866-662-6254

Ocala/The Villages

Showroom Location
120 SE Hwy. 484
Ocala, FL 34480

M - F / 8:00AM – 4:30PM
Call: 352-205-4204

Orlando/Daytona

Orange, Volusia, Flagler, Seminole & Osceola Counties

M - F / 8:00AM – 4:30PM
Call: 866-662-6254

Pasco/Hernando

Pasco & Hernando Counties

M - F / 8:00AM – 4:30PM
Call: 866-662-4214

Jacksonville

St. Johns, Putnam, Clay, Bradford, Union, Columbia, Baker, Duval & Nassau Counties

M - F / 8:00AM – 4:30PM
Call: 866-662-6254

© 2024 The Solar Guys, Inc. All Rights Reserved | Privacy Policy | Accessibility

Licensing: CBC1260615 | CCC1330841 | CVC57042